Wooden Houses
INSTALLATION STEPS
Framework Installation
Roof
Step 2
Electricals / Plumbing
Floors
Installation and Frames
STEP 1
Framework Installation
Designed and installed a wall comprising:
- Concentrate frame with vertical planks section 4X2 CM per 45 cm from a selectedand treated by the Filand.
- Exterior OSB-thick polystyrene foam 10 cm for thermal and sound insulation, plasterboard KNAUF.
- Outside, Thermoprosopsis composed of O.S.B.
STEP 3
Electricals / Plumbing
The electrical installation is complete with a metallic switch panel and automatic fuses. The installation takes place by using wall boxes according to the state regulations. The cabling passes through pipes SIBI (PVC) with proportional cutting according to the urban planning arrangements.
The plumbing facilities are from approved plastic or multi layer pipes of steel, used as the basis (water system and heating), while the drainages are of PVC pipes. All the tubing passes through the wall.
STEP 4
Floors
The images you see are only a representative sample of the many materials you canfind in our reports.
Ask our experienced staff for valuable and unique solutions to the choice of flooringthat fits your needs.
STEP 5
Installation and Frames
This takes precedence over your own taste because you can put in your home verything you want from kitchen cabinets, interior and exterior doors and frames.
Finally shape the surrounding area is checked and delivered to the customer key of the new house!